Timing is important when scheduling electrical work

by Lauterborn Electric on June 26th, 2012

We are in the middle of summer and just went through a heat wave. Can you guess how many calls we received over the last three days for air conditioning lines? Twelve is the answer and we do try to accommodate our customers, but it is impossible to get to everyone. Game planning with your licensed electrician can make the dog days of summer go smoother with a properly installed air conditioning line to plug in your unit. On some of the calls, the costumer had lost power to the receptacle they were plugging their units into. Not having a designated line for your air conditioners can lead to over loading of a circuit causing tripping of a breaker or a fuse blowing.

Contact your licensed electrical contractor Lauterborn Electric for all of your electrical needs.